{"id":57,"date":"2021-03-23T16:56:00","date_gmt":"2021-03-23T16:56:00","guid":{"rendered":"https:\/\/adamonengineering.com\/?p=57"},"modified":"2023-08-01T16:57:39","modified_gmt":"2023-08-01T15:57:39","slug":"r1-5pw-rebuild-post-11","status":"publish","type":"post","link":"https:\/\/adamonengineering.com\/index.php\/2021\/03\/23\/r1-5pw-rebuild-post-11\/","title":{"rendered":"R1 5PW Rebuild &#8211; Post 11"},"content":{"rendered":"\n<p>So, it&#8217;s been 3 years, 9 months, 4 days since the last update. What can I say, I&#8217;ve been busy! Mostly rescuing old computers from Europe (<a href=\"https:\/\/ibms360.co.uk\/\">https:\/\/ibms360.co.uk\/<\/a>) amongst other things&#8230;\n\nNothing has really happened with the bike. I moved it up to my workshop in late 2019 and thats mostly where its sat since. I&#8217;ve acquired a few parts for it here and there like a clean, un-dented tank and some gaskets etc. but thats about it.\n\nI went up to the workshop this evening and pulled it out of the back. I made a list of parts I need to move it along, things like rubber grommets for the radiator mounts etc. and I also had a rummage through the garage for some of the parts I was missing (like 3 of the inlet rubbers, which were on the old cylinder head), and put them to one side. I couldn&#8217;t find the rubber heat shield from the top of the engine or the two plastic covers, so I ordered them from a breaker on eBay today.\n\nHeres how she sits now:<\/p>\n\n<img decoding=\"async\" src=\"https:\/\/www.bikechatforums.com\/files\/img_1806.jpg\" \/>\n\n<p>Hopefully I&#8217;ll get some work done on her soon, and maybe 2021 will be the year I get this (now almost classic status!) R1 back on the road!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>So, it&#8217;s been 3 years, 9 months, 4 days since the last update. What can I say, I&#8217;ve been busy! Mostly rescuing old computers from Europe (https:\/\/ibms360.co.uk\/) amongst other things&#8230; Nothing has really happened with the bike. I moved it up to my workshop in late 2019 and thats mostly <a href=\"https:\/\/adamonengineering.com\/index.php\/2021\/03\/23\/r1-5pw-rebuild-post-11\/\" class=\"btn btn-link continue-link\">Continue Reading<\/a><\/p>\n","protected":false},"author":1,"featured_media":58,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,4,2],"tags":[],"class_list":["post-57","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-motorbikes","category-r1-5pw-rebuild","category-vehicles"],"_links":{"self":[{"href":"https:\/\/adamonengineering.com\/index.php\/wp-json\/wp\/v2\/posts\/57","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adamonengineering.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/adamonengineering.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/adamonengineering.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/adamonengineering.com\/index.php\/wp-json\/wp\/v2\/comments?post=57"}],"version-history":[{"count":1,"href":"https:\/\/adamonengineering.com\/index.php\/wp-json\/wp\/v2\/posts\/57\/revisions"}],"predecessor-version":[{"id":59,"href":"https:\/\/adamonengineering.com\/index.php\/wp-json\/wp\/v2\/posts\/57\/revisions\/59"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/adamonengineering.com\/index.php\/wp-json\/wp\/v2\/media\/58"}],"wp:attachment":[{"href":"https:\/\/adamonengineering.com\/index.php\/wp-json\/wp\/v2\/media?parent=57"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/adamonengineering.com\/index.php\/wp-json\/wp\/v2\/categories?post=57"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/adamonengineering.com\/index.php\/wp-json\/wp\/v2\/tags?post=57"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}